 |
 |
 |
 |
|
 |
 |
 |
 |
|
 |
|
|
Installing your Fiberglass pool Step 1: Preparing site, excavate the hole and line with sand. Step 2: Setting and back-filling, we help you set and level the pool and oversee back-filling. Step 3: Hook up plumbing and electrical. Step 4: Pour deck Step 5: Start enjoying your pool. |
Things you will need to do to get started on your project. 1. Check with your county building department to see if a permit is required. 2. You will need a excavator to dig your hole and do the back-filling of your pool. ( detailed instruction manual and dig instructions will be given.) 3. When we bring the pool you will need 2 truck loads of riversand or motor sand . (approx.40 tons) 4. You will need a small crane truck to off load pool, a 5 ton boom truck is fine. 5. If you live in an area with a high water table you must install a well point. 6. You will need a electrician to hook up 220v plumb and light and also ground the pool for safety. 7.You will need to find a concrete contractor to do the deck around your pool. |
Pool Shapes, Sizes and Prices |
- 1 1/2 HP Pool Pump
- 2 Returns
- 1 Skimmer
- 1 Main drain
- 300 LB Sand Filter
- 3 Step Ladder
- Stainless Steel Handrail
- Pool Light
| - Manufacturer’s Warranty
- Automatic Chlorinator
- Schedule 40 PVC Plumbing Kit
- Maintenance Kit
- Equipment Pad
- Sales tax
| |
PRICE DOES NOT INCLUDE FREIGHT |
|
|
|
| |
|
|
 |
|
|
 |
|